Kelowna residents can expect overnight traffic delays as construction on a new overpass begins in the city. The project, which is set to improve traffic flow and safety, will cause temporary disruptions for drivers.
The overpass, located at the intersection of Highway 97 and Sexsmith Road, will be under construction from 9 p.m. to 5 a.m. starting on Monday, September 13th. These overnight closures are expected to last for approximately two weeks.
During this time, drivers are advised to plan alternate routes and allow for extra travel time. Detour signs will be in place to guide motorists around the construction site. Additionally, traffic control personnel will be on site to assist with traffic flow and ensure the safety of both drivers and construction workers.
The construction of this overpass is a part of the City of Kelowna’s ongoing efforts to improve transportation infrastructure and accommodate the growing population in the area. The overpass will provide a safer and more efficient route for drivers, particularly during peak traffic hours.
The City of Kelowna has also assured residents that every effort will be made to minimize disruptions and complete the project as quickly as possible. However, delays and closures may be necessary to ensure the safety of workers and the public.
Residents are encouraged to stay informed about the project and any updates by visiting the City of Kelowna’s website or following their social media channels. The city also reminds drivers to obey all traffic signs and speed limits in construction zones for the safety of everyone involved.
In conclusion, while the construction of the new overpass may cause temporary inconvenience, it is a necessary step towards improving traffic flow and safety in Kelowna. The City of Kelowna appreciates the patience and understanding of residents during this time and is committed to completing the project efficiently and effectively.